RimpeX Cost RimpeX Cost shows you the summary of cost performance of the project. Following are the features:
Monthly summary chart: The monthly cost performance histogram shows you the value of work done, the actual cost and the variance in every month of the project and its cumulative curves. These figures will be read automatically from the present estimation/costing/finance systems or it can also be entered manually every month.
Summary: summary of work done, remaining, etc
CPI: cost performance index in a gauge display.
Trend: current trend of cost performance.
BOQ Item level breakup: item level break of the cost performance charts and values.
Integration configuration: database integration configurations to get the values required for RimpeX Cost from the existing systems of estimation/costing/finance.
>Data entry forms: If the data integration is not used then this is the alternate method of entering work done and actual cost every month.
Print: print the current display results.
Before you work with RimpeX Cost, please watch the following video.