Work Target
Complete all concrete works in the marked area within 2 days
Further delay impacts the installation of steel structure.
Risk Exposure : $5,000 per day
Risk Level : High
Technical Issue
Assembly part doesn’t match.
Inform supplier to replace proper machine part
Risk Exposure : $1,000 if delivery is delayed more than three days
Risk Level : Very High
Unsafe Conditiont
Excavation without proper protection
Heavy equipment is in risk
Risk Exposure : $5,000
Risk Level : High
Installation
Alignment of the pressure gauge installed is not vertical.
Please refer shop drawing and reinstall properly
Risk Exposure : $500
Risk Level : Low
Idle Resource
Crane and crane operators are idle for last two days, waiting of material to erect.
Subcontractor is not delivered material on time .
Risk Exposure : $2,000
Risk Level : High
Idle Site / Planning Issue
Major section of the site is idle due to delay of inspection by municipality.
Due to lack of planning and follow-up
Risk Exposure : $10,000 per day
Risk Level : Very High
Non-Conformance
Incorrect installation. Location of fittings not as per the drawing.
Refer construction drawing and change the location.
Risk Exposure : 15,000 per day
Risk Level : Moderate
Information
Details provided in the shop drawing is not enough
Request engineer to provide required information.
Risk Exposure : $1,000
Risk Level : Low
Security Issue
CCTV is not functioning
Incident monitoring is under risk
Risk Exposure : $3,000
Risk Level : Moderate
Utility Damage
Damage to existing live water line.
Follow suitable excavation method considering existing utility drawing
Risk Exposure : $2,000
Risk Level : High
Purchase Issue
4th item is missing in the purchase order
Inform supplier to deliver within 24 hours
Risk Exposure : $5,000
Risk Level : High
CVI
Confirmation of Verbal Instructions in an informal urgent meeting in the site office.
Hold all works today and focus on approval issues
Risk Exposure : $4,000
Risk Level : High
Unsafe Act
Formwork installation without proper safety measures
Warn the employee and send him for safety training.
Risk Exposure : $10,000
Risk Level : High
Testing / Inspection
Test the pressure pipe line connections.
Concrete work around the connection is delayed for the last 5 days.
Risk Exposure : $1,000
Risk Level : Moderate
Approval / Payment
Inspection approval is pending for the completed manhole work.
Payment is delayed 45 days after completion of the work
Risk Exposure : $250
Risk Level : Low
Material Wastage
Excess material found in the store.
Due to lack of periodic material reconciliation checks.
Risk Exposure : $3,000
Risk Level : Moderate